Focused update
$10,000–$18,000Most realistic for a controlled, same-layout room with limited tile and trade changes.
- Selected vanity, fixture, lighting, or finish replacement
- Defined wet-area or floor scope
- Readily available product selections
Lake and McHenry Counties · bathroom contractor
An Island Lake bathroom can feel more usable through better light, storage, and circulation even when the walls stay. Window condition, privacy, shower containment, ventilation, and long-term cleaning should be resolved together.
Scope-based planning ranges
The room must be measured and inspected before pricing. These are market-planning bands—not a Master Craft & Design quote, customer invoice, or guarantee.
Most realistic for a controlled, same-layout room with limited tile and trade changes.
A coordinated room renovation with wet-area, cabinetry, trade, and finish work.
Broader work shaped by room size, custom tile and glass, layout, or premium products.
A same-footprint plan can prioritize cabinetry, waterproofing, tile, lighting, and ventilation. Window changes, expanded showers, or fixture relocation should be priced with every connected surface and trade.
See the complete bathroom cost guide →Local planning priorities
Island Lake renovations often focus on getting more use from the existing footprint and strengthening the connection to outdoor space. Kitchens, baths, decks, windows, and built-ins are planned around circulation, storage, light, and long-term maintenance.
Coordinate glazing, coverings, shower spray, trim, waterproofing, and exterior condition when a bathroom window is involved.
Use drawers, recessed medicine storage, niches, and linen planning while protecting open floor area.
Avoid trapping valves, fans, electrical devices, or plumbing behind decorative work that cannot be serviced reasonably.
Confirm which building and trade inspections apply before closing walls or covering waterproofed assemblies.
Timeline by scope
Active construction begins after planning, required approvals, selections, and material readiness. The ranges below are estimates, not promised completion dates.
| Scope | Active-construction range | What the range assumes |
|---|---|---|
| Focused same-layout work | About 2–3 weeks | Controlled wet-area, vanity, fixture, and finish scope |
| Complete bathroom remodel | About 3–6 weeks | Coordinated waterproofing, tile, cabinetry, plumbing, and electrical |
| Primary, custom, or layout-changing | About 6–10+ weeks | Larger wet areas, custom glass, extensive tile, fixture moves, or repair |
Village submission and inspection steps, window or glass lead time, waterproofing, tile, and counter fabrication should be shown separately.
Real MasterCraft work · Evidence labeled
Seven matching photographs support observations about patterned tile, vanity work, fixtures, lighting, storage, and finish coordination.
This is a nearby or comparable Master Craft & Design project, not a claim that the photographed work occurred in Island Lake. The profile labels visible evidence, estimates, and unknowns separately.
Open the project evidence profile →Evidence rule: Photographs support visible finish and layout observations. They do not prove concealed framing, plumbing, electrical work, permits, a customer invoice, or the exact duration of a future Island Lake project.
Official local source
Island Lake's Building Department publishes a current permit application, building information, fee schedule, contractor registration, and inspection contact. Use the exact property address and connected project trades to confirm which current forms belong in the submission.
Review Village of Island Lake Building Department →
Permit requirements depend on the property and final bathroom scope. The issuing authority—not this page—makes the determination.
Clear answers
It requires project-specific evaluation of condition, material, privacy, waterproofing, trim, spray exposure, insulation, and exterior detailing. Relocation or replacement may be worth comparing.
Use vanity drawers, recessed medicine cabinets, niches, shallow wall storage, hooks, and carefully placed linen capacity based on measured clearances.
A focused same-layout bathroom may require roughly two to three weeks of active construction, a complete remodel about three to six weeks, and a larger primary or layout-changing project six to ten weeks or more. Village submission and inspection steps, window or glass lead time, waterproofing, tile, and counter fabrication should be shown separately. These are planning ranges, not a promised schedule.
Island Lake's Building Department publishes a current permit application, building information, fee schedule, contractor registration, and inspection contact. Use the exact property address and connected project trades to confirm which current forms belong in the submission. The issuing authority makes the project-specific determination.
Free in-home consultation
Share the address, existing room photographs, priorities, must-keep items, and the planning range you want the team to evaluate.